Name:
Phone:
Email:
Incident Description:

Construction Damages

MRR represented a general contractor who built a building to be used for manufacturing purposes. The construction contract included a concrete floor built with concrete supplied by a ready-mix company. The concrete floor developed “pop-outs,” which are small blemishes in the surface of the concrete floor. The building owner brought a claim in arbitration seeking damages against the general contractor on account of the pop-outs. MRR represented the general contractor in a lawsuit against the ready-mix concrete company, seeking to require the ready-mix company to in turn pay any damages owed to the building owner because of the pop-outs. On behalf of the general contractor, Jack Riedy successfully negotiated a $200,000 settlement with the ready-mix company.

MRR: Partnering with outside attorneys

If your client is faced with a personal injury case that requires mediation or complex litigation, we are ready to assist. As partners, we respectfully, purposefully move your client from...

.

Read more

Psychological Injury

Two university teammates left campus for an afternoon workout, one riding a bike, the other running. While on the sidewalk a speeding car hydroplaned, lost control, came onto the sidewalk...

.

Read more

Construction Damages

MRR represented a general contractor who built a building to be used for manufacturing purposes. The construction contract included a concrete floor built with concrete supplied by a ready-mix company....

.

Read more

MRR_Trust